Picked the hottest day of the year to work on the wood shed.
This is the 1st of 3 sections, each to be 16' X 6'7" +/-
8' tall in front, 6'6" in back
Semi leveled a pad (old stump & roots)
Dug down to gravel, filled hole with rock/gravel/sand up to 1' deep
buried a pillar block
treated 4X4 posts, braces beams & roof. (hurricane clamps on roof for strong winter winds)
Raked fairly level, old carpet, pallets
Ready for wood
Well need to put on metal roofing or roll roofing to water proof it..
This is the 1st of 3 sections, each to be 16' X 6'7" +/-
8' tall in front, 6'6" in back
Semi leveled a pad (old stump & roots)
Dug down to gravel, filled hole with rock/gravel/sand up to 1' deep
buried a pillar block
treated 4X4 posts, braces beams & roof. (hurricane clamps on roof for strong winter winds)
Raked fairly level, old carpet, pallets
Ready for wood
Well need to put on metal roofing or roll roofing to water proof it..