So I have my EKO installed and now need to run the pex. I am over sizing the tubing, running two 1" pex lines instead of one. The total run is about 40' from the EKO to the oil boiler. Yes it is O2 barrier pex.
The problem I am having is the pex is extremely difficult to straighten out and is breaking the brackets that are supposed to hold it in place. I imagine if I heat it up it would be easier to run but don't know of an easy way to do this. Suggestions please!
The problem I am having is the pex is extremely difficult to straighten out and is breaking the brackets that are supposed to hold it in place. I imagine if I heat it up it would be easier to run but don't know of an easy way to do this. Suggestions please!