The system inside the building is pretty much done.
I have the Garn Barn to build, the pipes to lay and the connections to be made.
And then my Propane bill should start heading down.
I have an outline sketch of the Garn Barn on my blog and a picture of the Boilers. Need to come up with names. Or just 47 and 48?
Construction of the barn, well concrete footers, 4 ft foundation wall, poured, or blocks, maybe AAC. Walls either PU 4" SIP R27 or AAC with blue-board. Roof SIPS or conventional. Clad in Hardie with either a metal roof or 50 year shingles. The latter would make a good try out for the main building.
The building keeps on getting bigger, but no more. Orientated in line with my wood pile and the south for possible Solar HW later. Much later.
I have the Garn Barn to build, the pipes to lay and the connections to be made.
And then my Propane bill should start heading down.
I have an outline sketch of the Garn Barn on my blog and a picture of the Boilers. Need to come up with names. Or just 47 and 48?
Construction of the barn, well concrete footers, 4 ft foundation wall, poured, or blocks, maybe AAC. Walls either PU 4" SIP R27 or AAC with blue-board. Roof SIPS or conventional. Clad in Hardie with either a metal roof or 50 year shingles. The latter would make a good try out for the main building.
The building keeps on getting bigger, but no more. Orientated in line with my wood pile and the south for possible Solar HW later. Much later.