So I have everything in place, a few chimney sections snapped together and in the attic, I'm at the point where its time to cut the roof. I used the supervent kit, which comes with 0/12-6/12 roof flashing. My pitch is about 8/12. Is there any possible way to use the flashing I have by snipping the top of the cone, or bending it somehow? It'd probably be easier to tell once I had it in place up on the roof, but I dont want to commit to cutting the roof and find out I cant finish the install.
The flashing I need is special order, and they told me they could have it by 11/11. I'd really prefer to not wait that long. In the event I can't use my current roof flashing, could I use flashing from a different system? Say the duravent one? If anyone has any suggestions/guidance it'd be greatly appreciated. I just wanna get this thing in and burning!
The flashing I need is special order, and they told me they could have it by 11/11. I'd really prefer to not wait that long. In the event I can't use my current roof flashing, could I use flashing from a different system? Say the duravent one? If anyone has any suggestions/guidance it'd be greatly appreciated. I just wanna get this thing in and burning!