My Fireview install (and of course with Pics!)

Jambx Posted By Jambx, Oct 4, 2011 at 3:49 PM

Thread Status:
Not open for further replies.
  1. Blue2ndaries

    Blue2ndaries
    Minister of Fire 2.
    NULL
    

    Oct 17, 2011
    697
    386
    Loc:
    Oregon
    Looking real nice, great job!
     
  2. nelraq

    nelraq
    Member 2.
    NULL
    

    Nov 11, 2009
    120
    0
    Loc:
    Coldstream, British Columbia
    +1. That's my take on it as well. You need 16 inches in front of the loading door(s).

    I burn an Oslo, so I needed 18" on the front AND on the left side because you can load through either door. (Have never used, nor will I ever use, the front door on the Oslo --- but I still needed the 18 inches to pass inspection.

    BTW I need 18 inches because that is the Canadian requirement.
     
Thread Status:
Not open for further replies.

Share This Page