Oil Furnace flue pipe clearances/pipe type in finished space

  • Active since 1995, Hearth.com is THE place on the internet for free information and advice about wood stoves, pellet stoves and other energy saving equipment.

    We strive to provide opinions, articles, discussions and history related to Hearth Products and in a more general sense, energy issues.

    We promote the EFFICIENT, RESPONSIBLE, CLEAN and SAFE use of all fuels, whether renewable or fossil.
Status
Not open for further replies.

kylej

New Member
Sep 14, 2011
10
Redding, CT
View attachment 94974 I'm renovating my basement, and there is a short section of oil furnace flue (6") that comes through an interior stud wall into the finished space, and then elbows into the masonry wall to reach the bottom of the chimney. It's currently single wall 6" pipe. When we bought the house it came through a wall with wood paneling (using a thimble). We ripped that down, used fire batt and put up drywall. I realize these photos are still not up to code as the drywall is too close to the pipe, and that you are supposed to have 18" clearance to combustibles, but this condition is better than when we bought it. As I see it I have three options:

- Replace the straight length of pipe with class A insulated pipe. I'd use an insulated thimble (do I need one on the interior partition and at the masonry partition as well?) Dura-vent and similar doesn't seem to sell 90 degree elbows.
-insulate the existing pipe (can I do this and still be allowed 2" clearance to drywall?)
-cut the drywall I put in already back 18", and use cement board instead. Keep single wall pipe and get a new thimble. This room will be a kids playroom so I'm inclined to do something to keep the pipe temp down to the touch just in case even though its out of reach.

One other thing I should add is that I think the elbow needs to be removable so they can clean out the bottom of the chimney.

You can see how close this is to the wall in the second photo (shot from below). The wall without the thimble in the pic is 1/2" drywall on furring strips attached directly to the foundation. Any advice would be appreciated!
 

Attachments

  • 12.jpg
    12.jpg
    25.5 KB · Views: 726
  • 13.jpg
    13.jpg
    36.3 KB · Views: 737
Yikes, saying this is better than before is not saying much. That's like saying you now have tires on the car and eventually will get around to adding brakes. 18" clearance is what's called for. Cement board would have been a better approach but there would still be studs behind the sheet. I'm not sure what all the options are here, but don't run the furnace as is.
 
Can you bump out the wall in the corner so the pipe doesn't go through it?? I assume the area you are standing in the photo will be finished....seems you could bump out the corner, removing the sight of the pipe...and maybe put a short closet underneath for storage???
 
  • Like
Reactions: 343amc
Status
Not open for further replies.