I'm installing a new boiler soon. I have some piping that is 1" copper, and am wondering, for my back-up gas boiler, if I could use this. (it worked before).
The real question is would it be of any benefit to upsize the pipe for the last 6' or so, say to 1.25" or bigger?
Could this cause any problems?
The system will be pressurized.
Thanks for hte help.
Bill
The real question is would it be of any benefit to upsize the pipe for the last 6' or so, say to 1.25" or bigger?
Could this cause any problems?
The system will be pressurized.
Thanks for hte help.
Bill