I landed the final circuit on the subpanel last night. I installed this subpanel in my shed last year and had it inspected with only a few circuits. Since then I've added more circuits and I think I'm done. Ready for another inspection. Do you think it's okay? See any errors? Detached shed so isolated ground and neutral bars. The fat wires on the left are for the short run to a welder plug. The feed is only 60 amps.