EnglanderandHunstman
New Member
just got the 25pdvc a week ago and wanted to see if someone can verify i have plugged the correct holes......when removing the plate in the burn pot there are two holes on the rear section that are about 3/8' and sit next to each other. there are also two holes on either side of the burn pot in the lower section. these two holes face each other and are about 5/8-3/4 in diamater..i plugged the two larger holes that face each other. its been about 24 hours since doing this and i notice zero change in ash build up or heat. just wanted to check and make sure im not missing anthing here. thanks