..."Is that all?"
Worked a downed red oak this weekend for about 7 hrs total. The property is adjacent to our Church, so I was able to get the trailer about 70 yds to the cutting place. However, we needed to go under a main (~20" dia) branch, over the trunk (~25" dia), then over a rock wall to get the rounds out.
Pics show before and after of the tree, along with the resulting round stack.
I guess it all adds up.
Worked a downed red oak this weekend for about 7 hrs total. The property is adjacent to our Church, so I was able to get the trailer about 70 yds to the cutting place. However, we needed to go under a main (~20" dia) branch, over the trunk (~25" dia), then over a rock wall to get the rounds out.
Pics show before and after of the tree, along with the resulting round stack.
I guess it all adds up.