...processing wood.
I got around 7 cords from this load. Hard to calculate with slope of ground, etc.
Plus, added maybe 1/3 of the front pile (2/3 was there before).
Log picture from 1/13/12. Finished 2/20/12.
Whew. But don't have to hassle with the black flies this year.
I got around 7 cords from this load. Hard to calculate with slope of ground, etc.
Plus, added maybe 1/3 of the front pile (2/3 was there before).
Log picture from 1/13/12. Finished 2/20/12.
Whew. But don't have to hassle with the black flies this year.