Hi All
I'm hoping to get my underground lines in this weekend.
My plane was to have 4 1" lines buryed 4' underground,with aprox 6" closed cell insulation around each line.
I have 110 ft between bldgs,and the lines will run under a driveway.
The ground is hard clay.I plan on lining the trench with plastic.
Any other tips,or things i may have missed?
Thanks for the replys
Thomas