Hi! So I'm wondering the difference in drying time when wood is stacked loose in a pile vs stacked neatly in a row. The wood in question is Oak. For arguments sake, lets say my two cords of 16-18" oak splits stacked two rows deep and 4-5 feet high will dry in 24 months.
How long would the equivelent amount of oak splits take to dry when thrown loose onto a pile?
Thanks!
How long would the equivelent amount of oak splits take to dry when thrown loose onto a pile?
Thanks!