Just happened to go by a road project close by. Saw a bunch of logs.
Stopped & asked, they said bring a trailer & they'd load the logs with an excavator.
I got 2 trailer loads. A commercial wood cutter was there getting 3 log trailer loads.
I got 1-1/2 cord is my guess, 75% Spruce & 25% birch.
Just went out & got a pic of it bucked . Split/stack tomorrow maybe.
Dirty wood, it was drug thru the dirt several times, moved around with and excavator, hard on the chain but got thru it all. Chain in need of more than just a touch up.
Free, close, only had to drag the logs off the trailer with the ATV & buck it.
Every little bit helps
Stopped & asked, they said bring a trailer & they'd load the logs with an excavator.
I got 2 trailer loads. A commercial wood cutter was there getting 3 log trailer loads.
I got 1-1/2 cord is my guess, 75% Spruce & 25% birch.
Just went out & got a pic of it bucked . Split/stack tomorrow maybe.
Dirty wood, it was drug thru the dirt several times, moved around with and excavator, hard on the chain but got thru it all. Chain in need of more than just a touch up.
Free, close, only had to drag the logs off the trailer with the ATV & buck it.
Every little bit helps