Ripped out the old....
Moved pipes (buried the PVC vent pipe from bathroom below in wall, moved outside air to back corner), and added a new duct to blow warm air to bedroom below on 1st floor (the stove is going on 2nd floor), and new 6" Class A SS chimney installed. Framed new walsl and hearth area. Durarock and slate going in this week.
Woodstock, get my stove shipped, I'll be ready for it next week!
Moved pipes (buried the PVC vent pipe from bathroom below in wall, moved outside air to back corner), and added a new duct to blow warm air to bedroom below on 1st floor (the stove is going on 2nd floor), and new 6" Class A SS chimney installed. Framed new walsl and hearth area. Durarock and slate going in this week.
Woodstock, get my stove shipped, I'll be ready for it next week!