    finished a install with a monessen direct vent and noticed some discrepancies in the owner/ install manual or maybe its me... the manual states rough opening of "41.75 inches height" and "do not use flanges for framing or header" , "for drywall support only" BUT my header is at the flange? any input or suggestions appreciated? i really don't want to start cutting up the framing...
    [​IMG]
    screenshot software for windows

    [​IMG]
     
  2. DAKSY

    DAKSY
    Patriot Guard Rider Moderator 2.
    NULL
    
    Staff Member

    Dec 2, 2008
    6,380
    1,139
    Loc:
    Averill Park, NY, on Burden Lake II...
    Definitely contradictory. If you're worried about the location of the header, replace it with a steel stud.
    If you've met the specifications for the rouch opening, I wouldn't worry about it, tho.
    I've installed hundreds of gas ZC boxes & screwed EVERYONE of them to the header...
     
  3. surf_n_bid

    surf_n_bid
    New Member 2.
    NULL
    

    Mar 3, 2014
    2
    0
    Loc:
    east coast
    thanks for the reply daksy... really needed yours and others professional advice on this situation.
     