Hey guys, I currently have a PE Summit that I am not overly enthusiastic about. As a result I have seriously considered buying the Blaze King, especially for the longer burn times and bigger wood box. So, when I bought the house 20 years ago and installed my Consolidated Dutchwest I put in a 6 in double wall thimble through the basement cement wall and chimney outside the house. I recognize that if I go with the BK, the connector is 8†and you should not neck down to a 6â€. That in itself causes me to install a new chimney. In redoing it, what would you guys recommend? Would it be best to stay with a metal pipe for a chimney or would it be better to just build a masonry block and tile chimney instead? Thanks for the insight.
cass
cass