1. Welcome Hearth.com Guests and Visitors - Please enjoy our forums!
    Hearth.com GOLD Sponsors who help bring the site content to you:
    Hearthstone Soapstone and Cast-Iron stoves( Wood, Gas or Pellet Stoves and Inserts)
    Caluwe - Passion for Fire and Water ( Pellet and Wood Hydronic and Space Heating)

Mt Vernon AE Mantle Requirements

Post in 'The Pellet Mill - Pellet and Multifuel Stoves' started by smwilliamson, Jan 30, 2013.

  1. smwilliamson

    smwilliamson Minister of Fire

    Joined:
    Dec 28, 2009
    Messages:
    3,888
    Loc:
    Southcoast, MA
    I do not a have a manual and the UL tag says refer to the installation manual for mantle clearances. Anyone?

    Helpful Sponsor Ads!





  2. john193

    john193 Minister of Fire

    Joined:
    Jan 11, 2010
    Messages:
    905
    Loc:
    Southeast PA
    I believe it is 12 inches. You can download the manual on the quadrafire site.
  3. kinsmanstoves

    kinsmanstoves Minister of Fire

    Joined:
    Aug 29, 2007
    Messages:
    3,354
    Loc:
    Kinsman, Oh 44428 Brookfield, Oh 44403
    To the iPad since I do not have a paper copy. 12" from the top of the hopper lid for a COMBUSTIBLE mantle.

    Eric
  4. smwilliamson

    smwilliamson Minister of Fire

    Joined:
    Dec 28, 2009
    Messages:
    3,888
    Loc:
    Southcoast, MA
    What is the maximum overhang
  5. kinsmanstoves

    kinsmanstoves Minister of Fire

    Joined:
    Aug 29, 2007
    Messages:
    3,354
    Loc:
    Kinsman, Oh 44428 Brookfield, Oh 44403
    that is height and max overhang.
  6. smwilliamson

    smwilliamson Minister of Fire

    Joined:
    Dec 28, 2009
    Messages:
    3,888
    Loc:
    Southcoast, MA
    Ty
  7. kinsmanstoves

    kinsmanstoves Minister of Fire

    Joined:
    Aug 29, 2007
    Messages:
    3,354
    Loc:
    Kinsman, Oh 44428 Brookfield, Oh 44403
    One of the reasons I am here, Lord knows it is not all the free beer I get as payment for my services.

Share This Page