Well the wood is sitting out in the rows. Next years supply is drying. The supply of wood for 2014-2015 is secured.
Now it's time to install the boiler. The sad part is I've had to remove my work bench and shelving storage in order to fit the boiler in and still be able to get rigs in the garage.
You can see behind the wagon the shelving and bench that I tore out
8' of bench and 21' of shelf were removed.
Now it's time to install the boiler. The sad part is I've had to remove my work bench and shelving storage in order to fit the boiler in and still be able to get rigs in the garage.
You can see behind the wagon the shelving and bench that I tore out
8' of bench and 21' of shelf were removed.