The big copper doesn't look so big in the pictures with an Econoburn 200. Still have sticker shock on copper prices!!
1-1/2" copper, boiler to tank.
1-1/4" copper, to logstor load.
Piping spread out because I had the room and it is headed to the tank in the enclosed lean to. All added up to plenty of pipe.
Decided to do supply side circulator. Before you post it is wrong, The Danfoss Tech advised the pump on supply works well with their valve and it will aid in air elimination having it on the supply.
gg
1-1/2" copper, boiler to tank.
1-1/4" copper, to logstor load.
Piping spread out because I had the room and it is headed to the tank in the enclosed lean to. All added up to plenty of pipe.
Decided to do supply side circulator. Before you post it is wrong, The Danfoss Tech advised the pump on supply works well with their valve and it will aid in air elimination having it on the supply.
gg