Well almost done with boiler shed piping and shop radiant floor hook up. My house however still has a week or so till it will be ready. Can I run the system without cleaning for a week or put cleaner in and leave in untill house is ready, or should I just wait till everything is done to light it up. I am using a couple of old propane tanks for storage 1000 gal so I dont want to treat it twice. Any advise is appreceated as allways.
THANKS J.T.
PS It's really cold here and I'm getting anxious ! OK I better get off here and do some plumbing.