Assuming the UPS man delivers my 5' flex section today, I hope to be installing my Osburn insert tonight. I wanted to make a quick list of things to try and avoid and mid-install trips to the store. Here's what I've got:
- Osburn Matrix insert
- Several sections of 6" DuraVent rigid pipe, 6" round stove connector, extend-a-cap, 5' insulation sleeve, and *soon* 5 foot 6" flex section
- Pop rivet gun and stainless steel rivets that came with rigid pipe
- Some sheet metal screws for attaching stove connector to insert, and flex section to stove connector
- Furnace cement for sealing stove connector to insert
- High temp silicon for sealing extend-a-cap base plate to top of chimney
- Roxul for behind blockoff plate
- 24 gauge sheet metal for fabricating blockoff plate
- High temp spraypaint for blockoff plate
- Outside air kit for insert, including stove flange, vent for outside, 8' of 5" aluminum ducting and clamps
- Foil tape to seal around both ends of OAK ducting
- Silicon for sealing vent to siding