Picked up the biomass 60 at the trucking terminal last night. Haven't unloaded it yet. ( trying to find someone close with a loader ) It really made the 1 ton Dodge Squat. Still lots of work to do before on-line. Maybe in a month
I'll be getting close to lighting it up ,but I'm probably being optimistic. My elec. rates go up in dec due to government regulations on coal fired power plants which is were my elec. comes from, so I'm hoping to have it running by then. I'll post some pics once I get going on it.