The MN PUC directed Xcel Energy to go ahead with three large solar installations, which will be on-line before the end of 2016. This is the follow-up to a prior decision requiring Xcel to add PV. A separate 100 MW PV installation also is going ahead by Geronimo Energy. With these three projects, "the result will be a 16-fold increase in the state’s solar capacity, which currently is 17.8 megawatts." 187 MW of PC