do i have enough draft? when the chimney was put up we went through the wall and u 2-24" sections. so my chimney consists of the black pipe, 2 sections rise, 1 elbow, through the thimble, T on the other side of the wall, and then 2 24" sections of chimney pipe, then a chimney cap. do i need more draft? when i was starting the stove it wasnt easy to get a good stable fire going. every time i thought i was starting to get a decent fire and i closed the door the fire would die down. i finally got a good stable fire and was able to keep the temp gauge on the black pipe in the 450 degree range. this was with the damper full open. im thinking of adding 1 more section of class a chimney pipe. the chimney is a selkirk class A, i believe its the ultra-temp series.