- Oct 3, 2007
- 1,539
What granpajohn said. 3 layers of progressively smaller sizes of stone. With regard to just filling and grading with dirt, one of the obstacles I'm dealing with is a small lot with a lot of obstructions. If it was as easy as backing up a triaxle dump and dropping a full load of dirt that would be one thing. I'm dealing with a spot in the back corner of the yard surrounded by fences on all sides. The only access to the backyard is through a 10' wide gate. I feel it would be easier to bring in loads of stone in my pickup a little at a time. I can drive to the quarry just up the road on a Saturday, pick up a load, back it into the yard, and shovel it off. Clean dirt, at least around here, is harder to come by, and IMHO, harder to move.

As for the rest of it, 10-4. I think I have a plan now...