Weds, the excavator will be here to 1) finish the ditch, 2) dig out the area for the slab 3) dump gravel for the slab.
The question is how do I bring the pex up into the area of concrete when the exc will be there for only a day ? Ill be using the foam in ditch method, so if I want the pipe to come up where planned, it will be about 8' from the edge of the slab. Should I have him dig the trench, then fill it back in and dig it back out by hand when the pex and foam get here ? I was thinking of using a piece of 10" flex plastic culvert (drain pipe) to come up where I need it to in the slab then to the edge of the slab where the ditch is. Hopefully figuring out a way to get the pex and foam through that stretch of pipe. Or do I just come into the shed at the edge of the slab through the wall ? Any ideas ?
The question is how do I bring the pex up into the area of concrete when the exc will be there for only a day ? Ill be using the foam in ditch method, so if I want the pipe to come up where planned, it will be about 8' from the edge of the slab. Should I have him dig the trench, then fill it back in and dig it back out by hand when the pex and foam get here ? I was thinking of using a piece of 10" flex plastic culvert (drain pipe) to come up where I need it to in the slab then to the edge of the slab where the ditch is. Hopefully figuring out a way to get the pex and foam through that stretch of pipe. Or do I just come into the shed at the edge of the slab through the wall ? Any ideas ?