I am installing my pellet stove my chimney is 7mtrs am doing 2 MTRS in 80mm then the 5 MTRS at 125 mm the run the run is straight up the existing chimney I just found a note in the instruction book saying the run must not be more than 6mtrs any advice would be great I think it should have a long run above the roof line any help would be great