We're in the planning stages of adding a freestanding garage. The project will require moving the septic tank and leaching pools and therefore require excavation of a hole 16'd x 35'l x 15'w.
Is this deep/large enough for closed loop geothermal use? It would be nice to at least bury the tubing with the ground open, even if I don't complete the install at this time.
The home is on Long Island, NY, with about 2500 sq ft under heat/air.
Is this deep/large enough for closed loop geothermal use? It would be nice to at least bury the tubing with the ground open, even if I don't complete the install at this time.
The home is on Long Island, NY, with about 2500 sq ft under heat/air.