I am ready to order the pipe components for a new pellet stove install. I am planning on going with DuraVent pipe and the install will include a cathedral ceiling box 3PVP-KVB Having never installed a stove before I have a couple questions.
Does the stove pipe connect to the bottom of the box or just run through it? From the top of my clean out tee to above my roof where the cap will be is 115 inches. So I was just going to get two 5 ft sections.
Does the stove pipe connect to the bottom of the box or just run through it? From the top of my clean out tee to above my roof where the cap will be is 115 inches. So I was just going to get two 5 ft sections.