So, I installed a supervent 6 inch cathedral support box. According to the manual I need to have two inches of the support box into the room at the lower end and I need 2.5 inches of chimney pipe into the room.
My setup is 2 inches of box in the room at the lower end and I have chimney pipe come in at 2.75 inches.
Well I might have made a mistake.
The room is being finished and drywall being put up. When I had the box come into the room I have it in at exactly two inches form the ceiling stud. Now if I add drywall that is 5/8 the box does not enter the room by 2 inches or does it. I was not sure if the manual meant entering the room past the drywall or by the ceiling stud? Is this okay?
My setup is 2 inches of box in the room at the lower end and I have chimney pipe come in at 2.75 inches.
Well I might have made a mistake.
The room is being finished and drywall being put up. When I had the box come into the room I have it in at exactly two inches form the ceiling stud. Now if I add drywall that is 5/8 the box does not enter the room by 2 inches or does it. I was not sure if the manual meant entering the room past the drywall or by the ceiling stud? Is this okay?