Looking for advise/confirmation on my plan here.
We're planning to replace our siding with pine board and batten. 12"x1" boards. Currently, house is 1/2" Sheathing nailed directly to the studs.
My plan:
- run 1"x4" strapping over top of the sheathing, 24" apart, for a nailing surface for the vertical board and batten.
- add 1" rigid insulation sheets between the strapping to fill the void and add R value to the walls.
- wrap with house wrap / tyvek.
- ready for board and batten siding.
Thoughts? Do I need the housewrap?