Heatilator EC36 raised hearth extension help

  • Active since 1995, Hearth.com is THE place on the internet for free information and advice about wood stoves, pellet stoves and other energy saving equipment.

    We strive to provide opinions, articles, discussions and history related to Hearth Products and in a more general sense, energy issues.

    We promote the EFFICIENT, RESPONSIBLE, CLEAN and SAFE use of all fuels, whether renewable or fossil.
  • Hope everyone has a wonderful and warm Thanksgiving!
  • Super Cedar firestarters 30% discount Use code Hearth2024 Click here
Status
Not open for further replies.

Jacob Miller

New Member
Oct 13, 2013
3
El Paso, Texas
Hello everyone! I am new to this forum, and to fireplace/hearth building as well. Please excuse me if I use the wrong terminology, or if I have posted this thread in the wrong area.

I am building a raised hearth extension for my Heatilator EC36 wood burning, with gas lighter, fireplace.

The fireplace is original with the home, circa 2001, which was built by Tropicana Homes in El Paso, Texas.

The fireplace is set on an outside wall, right next to back door, and the chimney is built out from the house.

The unit is set in wood framing, approximately 1 ft. off the floor. It was surrounded by 12"x12" porcelain or ceramic tiles on all four sides. Each tile overlapped the metal face of the unit by approximately 2". This is listed as okay in the Heatilator installation manual which I just downloaded.

Last Christmas, I installed a prefabricated wood mantel shelf, bought at HD, that is about 16" over the top of the firebox. This was a random placement, but does comply with Heatilator's requirement of at least 12" over the firebox.

Now I want to build a raised hearth extension in front of the fireplace. The fireplace unit itself is about 36" wide, and my hearth will be 67" wide (right to the edge of the back door). The height of the hearth is approximately 12.5", which will cover some of the metal facing of the fireplace. The depth of the hearth in front of the fireplace is to be 15.25". Heatilator does show a hearth depth of 16" in their installation manual. Is this a code requirement? Would 15.25" suffice? Each of the two outside corners of the hearth will have a 45 degree angle, making the hearth five-sided.

I have actually already built the 2"x4" and 1/2" plywood frame. On top of the plywood, on the horizontal surface of the hearth, I had planned to use two layers of 1/2" Durock, with metal lathe sandwiched between. I designed it this way after Google research, explaining that it would add needed durability and solidity from dropped logs and weight. On the vertical surfaces, I had planned for one 1/2" layer of Durock since the tiles won't see the load the horizontal surface will.

Late Friday night after finishing the frame and sheathing it in plywood, I decided to do some more thorough research on fireplace hearth extensions. I have found out that materials in contact with the metal frame need to have a certain R value, 1.16 as per Heatilator Installation Manual for my model. This coincides with 2.25" of Durock, or 1/2" of Micore 300. I know Micore is hard to find, will try last place here locally on Monday morning. Even if I find it, I'm not willing to pay the $75+ for a sheet others have had to pay from their local fireplace builders. In this case, I will go with the layered Durock method.

I have also read that, though minimal, sheet metal and the tile, thinset mortar, and metal lathe, have some R value. I think I can install a layer of 24 gauge sheet metal on top of the plywood, followed by 4 layers of 1/2" Durock, and the 1/4" layer of tile, and meet the required R value. If need be, I can do 5 layers of Durock, which would definitely meet the R value, but require substantial rebuild of my hearth frame, essentially starting from scratch. To use just four layers of Durock, I just need to reduce the finished height of my frame by 1" to add two more layers of Durock without starting over.

I am also unsure as to what to use to mud the Durock, both between the layers (if necessary) and the seams. I have read that latex modified standard thinset will work. I have also read about refractory mortar which will handle heat changes better.

I am also unsure on what to use to actually adhere the tiles to the finished hearth and fireplace surround. I have come across suggested high temp or heat resistant thinset, refractory mortar (can that be used to adhere tiles to the Durock), as well as just using latex modified thinset.

Finally, do I need to add latex modifier to the grout to prevent cracking and separation from temperature fluctuations?

My questions are:

1) Are these layers (sheet metal, 2" Durock, 1/4" tile) enough R value?
2) Should I mud and or lathe between the four layers of Durock?
3) What should I use to mud between the Durock (if necessary) and the seams?
4) What should I use to adhere the tile to the Durock finished hearth frame?
5) Should I modify my grout to increase its flexibility, strength, resistance to cracking, etc?

I hope I haven't been too long winded. I am interested in doing it right. This is my mother-in-law's home that we rent, and will not be here forever. I would hate myself if an inspection occurred and the hearth was not acceptable and had to be removed. I do have a limited budget, but am willing to spend where it is necessary. What I told my fiance would be a simple, quick, and easy project has proven not to be. Any help would be greatly appreciated.

Thank you for reading my post and for any help you can offer.
 
Here are some pics of what I'm working with.
[Hearth.com] Heatilator EC36 raised hearth extension help [Hearth.com] Heatilator EC36 raised hearth extension help [Hearth.com] Heatilator EC36 raised hearth extension help [Hearth.com] Heatilator EC36 raised hearth extension help [Hearth.com] Heatilator EC36 raised hearth extension help
 
Last edited by a moderator:
There can't be combustibles (wood studs and plywood) directly in front of the fireplace without significant insulation protection. ( r value = 1.16 required) The hearth should not be in direct contact with the fireplace and should meet or exceed the minimum requirement of 16". To do this right the base should be planned so that the top plywood is low enough to accommodate the required insulation on top. Then there would be no contact risk between metal and wood and no blocking off of the fireplace intakes.but I am guessing that you already know that, so let's proceed.

For the hearth top yes you can use multiple layers of cement board or a layer of micore, then cement board. If using micore be sure to use 1/2 cement board on top for rigidity. To add up the layers this means on top of the plywood there would be 1/2" micore, 1/2" cement board, 1/8" latex modified thinset, 1/4" tile or a 1 3/8" build up on top of the plywood platform. In lieu of micore you could use 3 layers of 1/2 Durock NexGen or Permabase cement board for a final build up of 1 5/8". You can use regular grout and black silicone to seal the air gap between the base and the fireplace. If you do a tile lip on the front top edge or a bull nose you will be pretty close to the required 16".

  • No need for sheet metal if there are 3 layers of 1/2" Durock NexGen. (total R value of 1.17 will meet minimum requirements). But no harm in putting it down if you want.
  • No need for thinset between the Durock layers, just long screws. One screw every 8". Stagger the seams between layers if there are any.
  • Use latex modified thinset for the tile
  • No need for special grout.
  • Remember to have a small air gap (say 1/8" between the wood base and the fireplace.) There should be no direct contact between the fireplace face and the extension. Use an 1/8" shim across the back bottom of the base to hold it evenly off the wall. Use silicone to fill the gap.
  • Don't block any intake inlet slots at the bottom of the fireplace.
Question: How will the fireplace be trimmed on the sides and above it?
 
Last edited:
Status
Not open for further replies.