I'm installing a Englander Madison wood stove and have a couple questions about the chimney installation. It calls for a 6" chimney which is no problem. In order to install it where I want I have to have a thru wall installation. It will be a 90 at the top of the stove and a 30 before it goes thru the wall. These will be double wall. It will then go thru the wall into the prefab. It will then have a 30 degree offset to get away from a window before it goes up 20 feet. My question is will this be to many turns to get a good draft. This time of year I always have wind so I'm hoping for a decent draft.