Well we got the boiler plumbed in this weekend. have a couple of small weeps, hoping they will seal themselves up, they are on threaded fittings.
Heres the wood boiler, its circulator and the return temp control 3-way valve.
(broken link removed)
Return arm with additional Tees for storage, indirect hot water and future zone, save from having to to major work again.
(broken link removed)
Top Feed Arm connection to oil boiler and additional Tees.
(broken link removed)
Here is the oil beast, at the top on the piece of wood is the hour meter.
(broken link removed)
Thanks for all your input and help on this project.
~ Phil
Heres the wood boiler, its circulator and the return temp control 3-way valve.
(broken link removed)
Return arm with additional Tees for storage, indirect hot water and future zone, save from having to to major work again.
(broken link removed)
Top Feed Arm connection to oil boiler and additional Tees.
(broken link removed)
Here is the oil beast, at the top on the piece of wood is the hour meter.
(broken link removed)
Thanks for all your input and help on this project.
~ Phil