Hi there...
I have Summers Heat...love it. This will be season number two on Long Island. Here is the issue. Right now the top of the vent pipe is right at the height of the bottom of my roof (basically near the gutter). I need to increase the vertical height of the vent pipe about 6-8 ft to meet the 10'/2'/3' rule. IMO this will look stupid, but I don't think I have another choice (I cannot move the stove).
I know I need to go over to 4" pipe above a certain height...but I am most worried about the 6 or more ft of pipe that sticks up over the corner of the house.
Has anyone faced this? Any photos? I assume I need some sort of brace to hold up the pipe in strong winds?
Thanks!
I have Summers Heat...love it. This will be season number two on Long Island. Here is the issue. Right now the top of the vent pipe is right at the height of the bottom of my roof (basically near the gutter). I need to increase the vertical height of the vent pipe about 6-8 ft to meet the 10'/2'/3' rule. IMO this will look stupid, but I don't think I have another choice (I cannot move the stove).
I know I need to go over to 4" pipe above a certain height...but I am most worried about the 6 or more ft of pipe that sticks up over the corner of the house.
Has anyone faced this? Any photos? I assume I need some sort of brace to hold up the pipe in strong winds?
Thanks!