I'm picking up my Tarm on Saturday and in order to minimize the amount of time I'll be with out heat I'm dry fitting as much piping as I can now.  I'm running 1.25" black iron pipe for the main loop per Tarms layout.  Are there any minimum distances between 90's and tee's?  I don't have a lot of room so I'm going as short as I can between tee's and pumps and elbows. 
Also what the best way to seal all the joints so I don't get leaks. Joint compound only or tape as well?
Any other points to remember? With luck I'll have a fire going by Sunday evening.
Thanks
Greg H
	
		
			
		
		
	
				
			Also what the best way to seal all the joints so I don't get leaks. Joint compound only or tape as well?
Any other points to remember? With luck I'll have a fire going by Sunday evening.
Thanks
Greg H
 
	 
	 
 
		 
 
		 
 
		 
 
		