Had a pretty productive long weekend. Finished stacking the rest of the ash I was working on - 10 pallets full in the back of the garage, with room for 8 more. Plan is to fill those with black locust.
So I hauled and bucked the better part of four 14-15" avg BL trees that were down. Still a couple more trailer loads left to get.
This sawbuck is becoming the key to my workflow. I'll buck the tree into 2, 3, and 4 packs out in the woods. Once I have the logs up on the trailer, turning them into rounds is a piece of cake.
So I hauled and bucked the better part of four 14-15" avg BL trees that were down. Still a couple more trailer loads left to get.
This sawbuck is becoming the key to my workflow. I'll buck the tree into 2, 3, and 4 packs out in the woods. Once I have the logs up on the trailer, turning them into rounds is a piece of cake.