I was planning on installing my pellet stove 8 feet from my outer wall, by going up and through floor joists to the outer wall. I am now running into clearance complications with the ICC piping and my joists. Any suggestions on what can be done to still allow the piping through the space even though the clearance is like .5" around the joists? I have attached a couple of photos for reference. I was hoping that maybe wrapping the joists where closest with some heat shield or something.... Even though of cutting some of the joist away, but really would like to maintain the structural integrity on my home