I am slowly starting to plan the finishing of my house. House was design to the a 1.5 in slab poored over the first floor. (Engineered floor trust).
Anybody have done one thereself ?
Haven't decided yet if I'll be going with sleeper or a full slab, any tought ? At first I was all sold on gyp-crete but after a lot of reading, I guess I'll probabblly be going with a light weight self leveling grout, one that won't be affected if ever there is a water infiltration (Like the gyp-crete).
Also, I like to have the opportunity to rent out my basement apartment once we move upstairs, so I was thinking to lay a plastic layer or a kind rubber mat between the plywood and the slab to help sound-proffing it. Something that would create a good vibration stopper between the slab and the wood. Any idea on what could be used and if it would be worth it ?
After a lot of reading, I am still wondering If I should have simply planned for a stapple under for the main floor, but all my doors and windows are approx 1.5 in higher that the standard to acomodate the 1.5 in slab. And radiant panel seems to be really pricey. I will have significant heat from the sun (Solar passive) and I am affraid that a slab may react to slowly compare to a staple under or radiant panel.
Any inputs would be appreciated.
Thanks
Anybody have done one thereself ?
Haven't decided yet if I'll be going with sleeper or a full slab, any tought ? At first I was all sold on gyp-crete but after a lot of reading, I guess I'll probabblly be going with a light weight self leveling grout, one that won't be affected if ever there is a water infiltration (Like the gyp-crete).
Also, I like to have the opportunity to rent out my basement apartment once we move upstairs, so I was thinking to lay a plastic layer or a kind rubber mat between the plywood and the slab to help sound-proffing it. Something that would create a good vibration stopper between the slab and the wood. Any idea on what could be used and if it would be worth it ?
After a lot of reading, I am still wondering If I should have simply planned for a stapple under for the main floor, but all my doors and windows are approx 1.5 in higher that the standard to acomodate the 1.5 in slab. And radiant panel seems to be really pricey. I will have significant heat from the sun (Solar passive) and I am affraid that a slab may react to slowly compare to a staple under or radiant panel.
Any inputs would be appreciated.