A little recap. Off this week so I finished splitting and stacking what was left from a "roll _off " dumptster scrounge if you can call it a scrounge. $40 . paid the guy for the delivery. Some of the regulars here may remember that post. Finished the stacking in a line and a HH worked out to be 2.5 cord conseverative speaking locast and cherry. Ok , fine now I'm done for 2012-2013.
Heres where the "Jack _pot comes into play. Figured I would hit Atlantic City being that I'm on vacation, but NO, next door neighbor (non_burner) has a tree service cutting down a 40' white oak this morning. I ask the guy if he would Drop the main trunk 24" daimeter at waist height and buck 18". He says sure, swings the trunk over with this crane and worker bucks it all right on the proberty line. Sweet. I roll out the 27 ton splitter and killed the day . Hence I feel I hit the scrounge "Jack_POt".
Figure a great start for 2013-2014 Ty.
Heres where the "Jack _pot comes into play. Figured I would hit Atlantic City being that I'm on vacation, but NO, next door neighbor (non_burner) has a tree service cutting down a 40' white oak this morning. I ask the guy if he would Drop the main trunk 24" daimeter at waist height and buck 18". He says sure, swings the trunk over with this crane and worker bucks it all right on the proberty line. Sweet. I roll out the 27 ton splitter and killed the day . Hence I feel I hit the scrounge "Jack_POt".
Figure a great start for 2013-2014 Ty.