Well av been rattling on about the BK Princess that I bought.
So here it is.
The original install. Looks fairly raggedy. Pacific Energy Super 27.
Now in the shop with DWP.
Did some work i the basement, knocked that wall out, framed an insulated boarding, dry wall blaa blaa. Dragged the stove over to its final resting place. 2' of horizontal then 45* to 12" to 45* then 3' of vertical. Looks like it will have zero draft problems.
My chimney, ICC Excel 18ft.
Iam about 95% done. Just need a few screws here and there. Checked the unit over and found no defect. Ceramic Cat, the door seal is tight and appears to be lined up. Came with fans.
Anything I should know / check before it goes in 100%
So here it is.
The original install. Looks fairly raggedy. Pacific Energy Super 27.
Now in the shop with DWP.
Did some work i the basement, knocked that wall out, framed an insulated boarding, dry wall blaa blaa. Dragged the stove over to its final resting place. 2' of horizontal then 45* to 12" to 45* then 3' of vertical. Looks like it will have zero draft problems.
My chimney, ICC Excel 18ft.
Iam about 95% done. Just need a few screws here and there. Checked the unit over and found no defect. Ceramic Cat, the door seal is tight and appears to be lined up. Came with fans.
Anything I should know / check before it goes in 100%