Jags said:Hey Dave - if ya want, I can get you some 5/8" x 16 ft rock. It will cut down on the finishing. :lol:
(and yes, there truly is 5/8" x 16 ft drywall)
NO THANK YOU

I built a scaffold (on wheels with brakes) with 4' rollers so I didn't have to lift but one end at a time & walked/roll it up to the top in 4' increments for the ceiling. Then wooden "T" bars to hold it in place while I screwed it on.
It was fun, I could get 2 to 3 ceiling pieces a day.
Walls were 1/2", used the scaffold with step ups on the side then rolled the scaffold it in place.
12' was bad enough, less taping, 16' would take a "real men" to hang
