So I tore down the old lined cement block heatsink and am in the process of installing dsp and class a chimney. I have selkirk class a already so i purchased selkirk 206621 and the flashing for my roof. My question is am I going to have to get one of those black support boxes or do I just cut back the clearances and use the trim provided? Northline claims everything except the flashing for the roof is provided in the kit. I just want to be doubley sure. Perhaps from someone who has used this particular kit already or installed one.
Thanks
Tony
Sent from my SM-G900V using Tapatalk
Sent from my SM-G900V using Tapatalk
Thanks
Tony
Sent from my SM-G900V using Tapatalk
Sent from my SM-G900V using Tapatalk
![[Hearth.com] Cathedral ceiling install [Hearth.com] Cathedral ceiling install](https://www.hearth.com/talk/data/attachments/201/201464-cc326057b18d0c82c6ba34ff606ad9d0.jpg?hash=UdRTPWSb05)
