I'm trying to work out the best time to call in the installers for my workshop.
The framing is complete, and it's 100% dried in.
Is it easier or better for the installers to handle the chimney/woodstove install before or after the ceiling and insulation goes up? (1/2" pine panels).
I won't be firing the stove until the ceiling is in. this is because of the ventilation system, i fear it'll cause huge draft problems, but i'd like to make this as easy as possible,
and it doesn't really matter to me when i start nailing the boards in.
The framing is complete, and it's 100% dried in.
Is it easier or better for the installers to handle the chimney/woodstove install before or after the ceiling and insulation goes up? (1/2" pine panels).
I won't be firing the stove until the ceiling is in. this is because of the ventilation system, i fear it'll cause huge draft problems, but i'd like to make this as easy as possible,
and it doesn't really matter to me when i start nailing the boards in.