Hey all, we are excited for our wood stove installation tomorrow (Thursday Nov 16th) by a local dealer/installer.
Our setup will be a sirocco 20 stove, double walled pipe going up about 16' with two 45s to off-peak of a cathedral ceiling (12/12 pitch) then 6' of pipe above the roof outside, about 4' above the peak at the top.
Should the installers stick around for the first fire to check the draft, performance, etc.? Any other suggestions regarding the install day?
Thanks for any input, if nothing else wish us luck for a smooth install
Our setup will be a sirocco 20 stove, double walled pipe going up about 16' with two 45s to off-peak of a cathedral ceiling (12/12 pitch) then 6' of pipe above the roof outside, about 4' above the peak at the top.
Should the installers stick around for the first fire to check the draft, performance, etc.? Any other suggestions regarding the install day?
Thanks for any input, if nothing else wish us luck for a smooth install