We just installed a jotul castine 400 with double wall pipe to reduce clearance along with a rear heat shield. passed inspection but notice that the wall next to stove reaches approx. 170f. Contractor said it passed so no need to worry but too hot for my liking. My question, if I put cultured stone or airstone (lowes) onto the sheetrock, it will be in the clearance section. Will the stone transfer to heat to sheetrock? If I put in cement board with a 1" air space, will it still be too close to stove now that its installed and I will be in the clearance zone? If we did install the 1" air gap, then the cement board and stone on top of that, how do you cover the gap? I imagine it looks bad? is it necessary?