I'm adding 3 receptacles and 2 outdoor yard lights to my deck. I'm OK on the receptacles, but my question is the new lights.
OK, I have 1 existing lamp post controlled by a mechanical timer, I have good access at the splice before it goes into the ground I the basement/crawl space.
If I splice my new connection there, will it also be controlled by the same timer?
Also, once I run to the first new light, can I piggy back off that to run to my second light; or will I need 2 runs?