Well i finally got my Englander 30NC tonight. gona un pack and work on setting it up tomarrow. Hopefully all goes well.
I was double checking my clearence a lil while ago and looks like i might have to move my chimney back a lil bit.
the distance from the top of the stove to the first floor is about 4.5ft. so im considering doing double wall with 2 45's off the flue. then it will be a straight shot up through the roof.
Has anyone run double wall the full length? I know it will be some added expense but it would save me from cutting a floor joist and boxing and reinforcing.
Guess it just depends if the stove store has the pipe i need.
I was double checking my clearence a lil while ago and looks like i might have to move my chimney back a lil bit.
the distance from the top of the stove to the first floor is about 4.5ft. so im considering doing double wall with 2 45's off the flue. then it will be a straight shot up through the roof.
Has anyone run double wall the full length? I know it will be some added expense but it would save me from cutting a floor joist and boxing and reinforcing.
Guess it just depends if the stove store has the pipe i need.