Erb’s Stove Center ordered 3” legs and I should be picking up the stove Jan 10th. It’s being installed on 1st floor of a 1700sq ft 2 story. Supplemental heat source.
Installed 21’ of class A chimney and working on a raised insulated hearth.
Provia Hearth stones for the hearth pad. 2 layers of 1/2” concrete board on a 2x4 frame. Provia castle rock ridge cut below the heart stones
I’m going to install and run the stove to make sure it’s far enough from my walls. Right now it’s 13” to the combustibles in the corners. So before I mortar everything in I want to make sure it doesn’t get the combustibles to hot.
After this winter I’ll finish the hearth walls with an air space, concrete board and Provia Castle Rock ridge cut. But my window sills are still close enough I want to make sure the stove location is good.
Installed 21’ of class A chimney and working on a raised insulated hearth.
Provia Hearth stones for the hearth pad. 2 layers of 1/2” concrete board on a 2x4 frame. Provia castle rock ridge cut below the heart stones
I’m going to install and run the stove to make sure it’s far enough from my walls. Right now it’s 13” to the combustibles in the corners. So before I mortar everything in I want to make sure it doesn’t get the combustibles to hot.
After this winter I’ll finish the hearth walls with an air space, concrete board and Provia Castle Rock ridge cut. But my window sills are still close enough I want to make sure the stove location is good.